AI-generated analysis. Always verify with the original filing.
Lion Copper and Gold Corp. completed a S-K 1300 Preliminary Feasibility Study & Technical Report Summary dated effective May 31, 2025. The filing includes consents from Samuel Engineering Inc., AGP Mining Consultants, Inc., and NewFields Mining Design & Technical Services, LLC as exhibits.
Event Type
Disclosure
Voluntary
Variant
8-K
. Other Events. Lion Copper and Gold Corp. has completed a S-K 1300 Preliminary Feasibility Study & Technical Report Summary dated effective May 31, 2025 for it
Exhibits. 23.1 Consent of Samuel Engineering Inc. 23.2 Consent of AGP Mining Consultants, Inc. 23.3 Consent of NewFields Mining Design & Technical Services, LLC