NexMetals Mining Corp. issued a news release reporting visual results from drill hole SMD-26-209 at the Selebi Main deposit, intersecting 10.50 metres of blebby, stringer, and massive sulphide mineralization, including 3.05 metres and 5.95 metres of massive sulphides. This step-out hole expands the Flexure Zone outside the 2024 Mineral Resource Estimate, with assays pending.
Key takeaways
Drill hole SMD-26-209 intersected 10.50m of sulphide mineralization from 1,768.65m to 1,779.15m depth.
Mineralization includes 3.05m and 5.95m of massive sulphides with pyrrhotite, chalcopyrite, magnetite, and minor amphibolite.
Hole located 350m southwest of SMD-25-205 (11.05m of 7.31% CuEq) and targets Flexure Zone down-dip/down-plunge of 2024 MRE.
Total surface drilling program: 19,130m across 8 completed holes, 1 extension, 3 abandoned, 3 in-progress.