NexGen Energy Ltd. announced results from its 2026 winter drill program at Patterson Corridor East, highlighting a 33% increase in the vertical extent of the high-grade subdomain to 550 meters and strong continuity of mineralization.
Key takeaways
The high-grade subdomain at Patterson Corridor East expanded vertically by 33% to 550m with a 210m strike length.
Drill hole RK-26-280c1 intersected 4.2m of >10,000 cps mineralization, extending the zone 230m down plunge.
Holes RK-26-271c1, RK-26-276, and RK-26-285 returned strong intercepts between 600-700m depth, indicating the system remains open for expansion.
A summer drilling program of approximately 29,200 meters is scheduled to commence the week of May 25, 2026.
Since discovery, 115 drillholes totaling 72,464.7m have targeted PCE mineralization, with 79 holes being mineralized.