BackSummary
Avino Silver & Gold Mines Ltd. filed a 6-K/A correcting a 'million' error in its Q1 2026 production results press release, reporting 568,112 silver equivalent ounces produced.
Key takeaways
- Q1 2026 production: 263,057 silver oz, 1,851 gold oz, 1,343,654 lbs copper, totaling 568,112 AgEq oz, down 10% from Q1 2025.
- 11% year-over-year increase in mill throughput to 185,497 dry tonnes.
- La Preciosa contributed 49,830 silver oz, with development ore processing slightly below early plan but exceeding Q4 2025.
- Inaugural mineral reserves: 27 million tonnes at 109 g/t Ag, 0.41 g/t Au, 0.31% Cu, equating to 127 million AgEq oz.
- Q1 financial results and conference call scheduled for May 13-14, 2026.
- Production expected weighted to H2 2026, on track for annual target.